• English | 简体中文
  • Completed! Several!

    At the end of 2021 and the beginning of 2022, many international projects were successfully completed, from the Mongolian Plateau to the Caribbean Sea, from the Middle East desert to the African island. BCEG International poured high-quality projects with sweat, paved the road of friendship with sincerity, demonstrated the role of a big country with "ingenuity", and made down-to-earth contributions to the journey of building "the Belt and Road" with high quality.
     

    Low-income Housing Phase II Project Aided by China in Grenada Completed

    On December 28, 2021, the second phase of China-aided project of low-income housing in Grenada successfully passed the completion acceptance. The project is located in Grenada, a Caribbean island country, in five plots, namely St. George, St. David, St. Patrick, St. Mark and Carriacou, with a total of 647 housing units, five property houses and supporting works, with a total construction area of about 30,400 square meters.
     

    According to the exchange of documents between the Government of the People's Republic of China and the Government of Grenada, the China-aided project of low-income housing in Grenada is divided into two phases, with a total of 1,000 housing units. 353 units of the first phase of the project were completed and handed over in 2015. The second phase undertaken by BCEG includes 647 housing units, supporting houses, outdoor roads, parking lots, slopes, retaining walls, vegetation restoration, as well as outdoor water supply and drainage, electrical and other supporting works within the red line of the site.
     

    The China-aided low-income housing project in Grenada has helped the Grenadian government solve the most urgent housing and livelihood problems, provided comfortable living space for the local people, greatly improved people’s quality of life, promoted community construction and economic development, and set an example of modern urban life for Grenada.
     

    Air Force Base Housing Project of the Ministry of Defense in Saudi Arabia

    On December 30, the air force base housing project of Ministry of Defense in Saudi Arabia was successfully completed and the key was handed over to the client. The project includes 12 five-story apartment buildings, 5 two-story apartment buildings, 1 mosque with a capacity of 400 people, 1 EPC water purification treatment plant, 1 sewage treatment plant, 1 deep well and supporting municipal infrastructure, with a construction area of 87,000 square meters.
     

    The successful completion of the project is the result of the company's strategic transformation, quality and efficiency improvement and the implementation of refined management. It is also the result of the project team's day and night struggle to overcome the changing situation and the impact of the global epidemic, effectively maintaining the international brand of BCEG and establishing a good image in the Middle East market.
     

    NexOne office building project in Mauritius, the project is located in Cyber City area of Mauritius, with a building area of 14,000 square meters. It is mainly a concrete frame structure, including underground parking, 7-story office building, separate technical service area and gatehouse, etc. The project started in October 2020 and was completed in December. The project team ran into the site from the beginning of the construction, overcame the global epidemic, staff shortage and other adverse effects, organized the construction quickly and completed the performance efficiently.
     

    Computer City NEXSKY office building project in Mauritius consists of the construction of an 18-story commercial building (including an underground parking lot) and other basic supporting facilities such as outdoor engineering, with a total construction area of 39,911 square meters, including surrounding ancillary structures and generator rooms, etc. The structural form is frame-shear wall structure.
     

    The RoseBell Infrastructure Project, located in RoseBell area in the south of Mauritius, includes the construction of 6.5km of 7m wide asphalt roads with concrete pedestrian walkways on each side, drainage ditches and road ancillary facilities along both sides of the road, 6.5km of DI pipe laying, 0.3km of telecom pipe laying, and 1.1km of electricity pipe laying and so on.
     

    Since the outbreak of the global epidemic, Mauritius has adopted relatively strict restrictions on the movement of people, which has a great impact on the introduction of labor. Mauritius Branch faced challenges, gave full play to the advantages of deep cultivation of local resources for many years, motivated the local staff, refined the schedule target, strengthened node control, improved work efficiency, and ensured the smooth completion of each project

     

    来源: 发布日期:2022-06-09